A communication cable PTCAB01 must be installed between each boiler in the cascade system. The cable has a 6 pin molex connector on one end and bare wires on the other end. The molex connector plugs into the Cascade Slave connector of the Slave boiler.
Please contact us for more information.
Product specifications, features and related information is subject to change without notice. We are not responsible for technical or typographical errors or omissions.
Some quantities may be limited.
All products once installed, are non-refundable unless caused by a manufacturer's defect.